Outfalls/Cable Landings
Owner: Venoco
Contractor: J-C General Eng.
Crossing: Shoreline/cliff below Sandpiper Golf Course (Exited 1400 Ft. ocean outfall line)
Length: 2400 LF (rock formation)
Pipe Size: 10" HDPE SDR9
An electrical conduit was installed from the top of the Santa Barbara cliff to the bottom of the ocean floor. Cable was then ran through the conduit to the Holly Platform.
Holly Platform
Holly Platform2
Holly Platform
1/2
Owner: City of Tiburon
Contractor: Team Ghilotti
Crossing: Reclaimed water outfall exiting on bottom of San Francisco Bay
Length: 500 LF (dirt/bay mud formation)
Pipe Size: 6" HDPE
A sewage treatment plant placed near the shore needed an outfall line installed. A barge with a winch and an A-frame was built to breakout tooling and stabilize turbidity curtains.
Tiburon
Tiburon
1/1