Outfalls/Cable Landings

Owner: Venoco

Contractor: J-C General Eng.

Crossing: Shoreline/cliff below Sandpiper Golf Course (Exited 1400 Ft. ocean outfall line)

Length: 2400 LF (rock formation)

Pipe Size: 10" HDPE SDR9

 

An electrical conduit was installed from the top of the Santa Barbara cliff to the bottom of the ocean floor. Cable was then ran through the conduit to the Holly Platform.

Owner: City of Tiburon

Contractor: Team Ghilotti

Crossing: Reclaimed water outfall exiting on bottom of San Francisco Bay

Length: 500 LF (dirt/bay mud formation)

Pipe Size: 6" HDPE

A sewage treatment plant placed near the shore needed an outfall line installed. A barge with a winch and an A-frame was built to breakout tooling and stabilize turbidity curtains.